RECORD DETAIL


Back To Previous

UPA Perpustakaan Universitas Jember

Rail construction cost risk management with bow-tie analysis: contractor’s perspective

Image of Rail construction cost risk management with bow-tie analysis: contractor’s perspective
Built Environment Project and Asset Management (2025) 15 (4): 753–771
Akses terbatas sivitas akademika UNEJ. Silakan menghubungi Petugas UPA Perpustakaan

Availability
BI000000173CSER 658.404 BUIPerpustakaan Pusat UNEJAvailable
Detail Information

Series Title

-

Call Number

SER 658.404 BUI

Publisher

Emerald Publishing Limited : Leeds,

Collation

-

Language

English

ISBN/ISSN

20441258

Classification

658.404

Detail Information

Content Type

E-Jurnal

Media Type

-

Carrier Type

online resource

Edition

-

Subject(s)

MANAJEMEN PROYEK

Specific Detail Info

-

Statement of Responsibility

No other version available