RECORD DETAIL


Back To Previous

UPA Perpustakaan Universitas Jember

Pengendalian waktu dan biaya pembangunan proyek Jember Icon fase dua dengan critical path method (CPM)

No image available for this title

Availability
30330201601395S 624.096 WIR p c.1Perpustakaan Pusat UNEJ (Skripsi)Available
Detail Information

Series Title

-

Call Number

S 624.096 WIR p

Publisher

Teknik Sipil Fak. Teknik UNEJ : Jember,

Collation

xviii, 95 lbr.:ill., lamp., tab.;28 cm.

Language

ISBN/ISSN

-

Classification

-

Detail Information

Content Type

-

Media Type

-

Carrier Type

-

Edition

-

Subject(s)

Construction

Specific Detail Info

-

Statement of Responsibility

No other version available