RECORD DETAIL


Back To Previous

UPA Perpustakaan Universitas Jember

Evaluasi Penjadwalan Waktu dan Biaya Menggunakan Metode Jalur Kritis (Critical Path Method - CPM) pada Proyek Pembangunan Rumah Tipe 60 di Perumahan Diamond City.

No image available for this title

Availability
3217202300983S 658.404 MUL e c.1Perpustakaan Pusat UNEJ (Tugas Akhir)Available but not for loan - Tidak dipinjamkan
Detail Information

Series Title

-

Call Number

S 658.404 MUL e c.1

Publisher

FEB, PS. Manajemen : Jember,

Collation

Xviii, 47 hlm.:ill.,lamp.,tab.;29 cm

Language

Indonesia

ISBN/ISSN

-

Classification

658.404

Detail Information

Content Type

Teks

Media Type

Buku

Carrier Type

volume

Edition

-

Subject(s)

MANAJEMEN PROYEK

Specific Detail Info

Bib.; hlm 38-39

Statement of Responsibility

No other version available