Web Online Public Access Catalog - Use the search options to find documents quickly

Search Result

Found 230 from your keywords: Author : "UNEJ-Fak.Teknik"
You currently on page 9 of 23 page(s)
Query took 2.35348 second(s) to complete
Re-Entry Dan Re-Evaluate Sumur Vertikal X-1 Dengan Sidetrack Dan Drilling Horizontal Pada Lapisan Top Reservoir

Re-Entry Dan Re-Evaluate Sumur Vertikal X-1 Dengan Sidetrack Dan Drilling Horizontal Pada Lapisan Top Reservoir

Call Number : S 622 NOV r c.1
Availability : 1 copies available for loan
Analisis Retention Time Terhadap Pemisahan Fasa Pada Three Phase Separator 260V-105 DI Unit Lube Oil Complex (LOC) III

Analisis Retention Time Terhadap Pemisahan Fasa Pada Three Phase Separator 260V-105 DI Unit Lube Oil Complex (LOC) III

Call Number : S 622 DEV a c.1
Availability : 1 copies available for loan
Pengujian Dan Analisis Sambungan Pada Precast Pvc Concrete Dalam Pembangunan Rumah Pracetak

Pengujian Dan Analisis Sambungan Pada Precast Pvc Concrete Dalam Pembangunan Rumah Pracetak

Call Number : S 620.1 CHR p c.1
Availability : 1 copies available for loan
Pra-Rancangan Pabrik Metil Klorida Dari Metanol Dan Hidrogen Klorida Dengan Kapasitas Produksi 10.000 Ton/Tahun

Pra-Rancangan Pabrik Metil Klorida Dari Metanol Dan Hidrogen Klorida Dengan Kapasitas Produksi 10.000 Ton/Tahun

Call Number : S 660 QOL p c.1
Availability : 1 copies available for loan
Pra-Rancangan Pabrik Metil Klorida Dari Metanol Dan Hidrogen Klorida Dengan Kapasitas Produksi 10.000 Ton/Tahun

Pra-Rancangan Pabrik Metil Klorida Dari Metanol Dan Hidrogen Klorida Dengan Kapasitas Produksi 10.000 Ton/Tahun

Call Number : S 660 SYA p c.1
Availability : 1 copies available for loan
Studi Keekonomian Pengembangan Lapangan Gas NE Menggunakan Psc Gross Spil Dan Cost Recovery

Studi Keekonomian Pengembangan Lapangan Gas NE Menggunakan Psc Gross Spil Dan Cost Recovery

Call Number : S 622 SAP s c.1
Availability : 1 copies available for loan
Prediksi Waktu Penggunaan ESP Dan Desain ESP Untuk Mengoptimalkan Produksi Sumur X

Prediksi Waktu Penggunaan ESP Dan Desain ESP Untuk Mengoptimalkan Produksi Sumur X

Call Number : S 622 ISL p c.1
Availability : 1 copies available for loan
Penilaian Kinerja Kawasan Hijau Kampus Bondowoso Universitas Jember

Penilaian Kinerja Kawasan Hijau Kampus Bondowoso Universitas Jember

Call Number : S 628 PUT p c.1
Availability : 1 copies available for loan
Integrasi Kawasan Wisata Cagar Budaya Situs Purbakala Sangiran

Integrasi Kawasan Wisata Cagar Budaya Situs Purbakala Sangiran

Call Number : S 628 JAS i c.1
Availability : 1 copies available for loan
Pengaruh Fraksi Volume Dan Perlakuan Karburisasi Serat Ampas Tebu PRG Terhadap Komposit Epoxy Dengan Uji Tarik, Uji Impak Dan Uji Mikro

Pengaruh Fraksi Volume Dan Perlakuan Karburisasi Serat Ampas Tebu PRG Terhadap Komposit Epoxy Dengan Uji Tarik, Uji Impak Dan Uji Mikro

Call Number : S 620.118 IDR p c.1
Availability : 1 copies available for loan