RECORD DETAIL


Back To Previous

UPA Perpustakaan Universitas Jember

Evaluasi Waktu dan Biaya menggunakan Critical Path Method (CPM) pada Proyek Pembangunan Fasilitas Offshore RIG PT. Saka Energi Muriah Ltd di Blok Kepodang Lepas Pantai Rembang.

No image available for this title

Availability
337202307355S 658.1511 DWI e c.1Perpustakaan Pusat UNEJ (Tugas Akhir)Available but not for loan - Tidak dipinjamkan
Detail Information

Series Title

-

Call Number

S 658.1511 DWI e c.1

Publisher

FE, PS Manajemen : Jember,

Collation

Xv, 56 hlm.:ill.,lamp.,tab.; 28 cm

Language

Indonesia

ISBN/ISSN

-

Classification

658.1511

Detail Information

Content Type

Teks

Media Type

Buku

Carrier Type

volume

Edition

-

Subject(s)

MANAJEMEN AKUNTANSI

Specific Detail Info

Bib.: hlm 35-36

Statement of Responsibility

No other version available