Web Online Public Access Catalog - Use the search options to find documents quickly

Search Result

Found 6 from your keywords: Subject : "INDUSTRI MINYAK BUMI-SUMBER ENERGI"
Query took 1.02481 second(s) to complete
Strategi Peningkatan Produksi Minyak:optimasi Sumur Esp, Pemilihan Tekanan Separator Dan Penambahan Pompa Sentrifugal Di Jaringan Pipa Lapangan J Sumatra Selatan

Strategi Peningkatan Produksi Minyak:optimasi Sumur Esp, Pemilihan Tekanan Separator Dan Penambahan Pompa Sentrifugal Di Jaringan Pipa Lapangan J Sumatra Selatan

Call Number : S 622 PED s c.1
Availability : 1 copies available for loan
Re-Entry Dan Re-Evaluate Sumur Vertikal X-1 Dengan Sidetrack Dan Drilling Horizontal Pada Lapisan Top Reservoir

Re-Entry Dan Re-Evaluate Sumur Vertikal X-1 Dengan Sidetrack Dan Drilling Horizontal Pada Lapisan Top Reservoir

Call Number : S 622 NOV r c.1
Availability : 1 copies available for loan
Analisis Retention Time Terhadap Pemisahan Fasa Pada Three Phase Separator 260V-105 DI Unit Lube Oil Complex (LOC) III

Analisis Retention Time Terhadap Pemisahan Fasa Pada Three Phase Separator 260V-105 DI Unit Lube Oil Complex (LOC) III

Call Number : S 622 DEV a c.1
Availability : 1 copies available for loan
Studi Keekonomian Pengembangan Lapangan Gas NE Menggunakan Psc Gross Spil Dan Cost Recovery

Studi Keekonomian Pengembangan Lapangan Gas NE Menggunakan Psc Gross Spil Dan Cost Recovery

Call Number : S 622 SAP s c.1
Availability : 1 copies available for loan
Prediksi Waktu Penggunaan ESP Dan Desain ESP Untuk Mengoptimalkan Produksi Sumur X

Prediksi Waktu Penggunaan ESP Dan Desain ESP Untuk Mengoptimalkan Produksi Sumur X

Call Number : S 622 ISL p c.1
Availability : 1 copies available for loan
Perancangan Pabrik Biodisel Dari Crude Palm Oil Dengan Kapasitas 200.000 KL/Tahun

Perancangan Pabrik Biodisel Dari Crude Palm Oil Dengan Kapasitas 200.000 KL/Tahun

Call Number : S 338.2 HAR p
Availability : 1 copies available for loan