RECORD DETAIL


Back To Previous

UPA Perpustakaan Universitas Jember

Perencanaan penjadwalan proyek konstruksi menggunakan CPM ( critical path method) Studi kasus gedung integrated laboratory for health science Universitas Jember

No image available for this title
Hadiah

Availability
3328201916188S 624.092 AYU p c.1Perpustakaan Pusat UNEJ (Tugas Ahkir)Available
Detail Information

Series Title

-

Call Number

S 624.092 AYU p

Publisher

D3 Teknik Sipil Fak. Teknik UNEJ : Jember,

Collation

xx, 450 hlm.; 28 cm

Language

Indonesia

ISBN/ISSN

3328201916188

Classification

624.092

Detail Information

Content Type

Teks

Media Type

Buku

Carrier Type

-

Edition

-

Subject(s)

PENGERJAAN PROYEK

Specific Detail Info

Bibl.: hlm. 85-87

Statement of Responsibility

No other version available